Three kinds of order, and how each one runs

Single shops, overnight refits and multi-site roll-outs are three different jobs. They are quoted differently, packed differently and scheduled differently.

Single shopOvernight refitMulti-siteOne contact
Cafe before opening: woven chairs, a round timber high table and sheer curtains across the windows
Fit-out · before opening
Home/Projects

01 · Single shop, opening once

The whole room is ordered at once, produced in one batch, and shipped as one consignment. The risk here is not the furniture, it is the sequence: a handover date that moves by two weeks while the container is already booked. We build the schedule backwards from your opening date and tell you the last date an order can be confirmed without a premium.

02 · Overnight refit, one night only

The shop trades until six and opens at eight the next morning. That changes two things. The new furniture has to arrive already assembled or assemble in under two minutes per piece, and it has to be packed in the order the room is assembled, labelled by position — because at two in the morning nobody is going to work out which of forty cartons is table three.

We pack by set and label by position on the plan. Where a room is being swapped in one night, we also send a packing list that matches the drawing line for line.

03 · Roll-out across several sites

Same furniture, several rooms, different dates. The constraint is consistency: a second batch produced six months later has to match the first in finish, and finishes move — a stain batch changes, a powder colour from a different supplier is a slightly different colour.

We keep the finish reference and a physical control sample from the first batch, so a later order is matched against the sample rather than against a colour code on a screen.

What is on the delivery documents

Packing listOne line per carton, labelled by position on the plan
Assembly sheetOne page per model, with the bolts listed by size
Care sheetWhat to use on the finish, and what not to
Loading photosSent before the container is sealed, so you see what was loaded

About the photographs on this page

The images above are placeholders while the site is being built; completed installations are photographed on site and the photographs are shared with the client before they are published. If you need to see a comparable room before ordering, ask and we will send what we have for a similar size and layout.

Can a fit-out be delivered in stages?
Yes. The common split is counter stools first, because the counter is finished before the floor, then tables and chairs. Each stage is priced and shipped on its own document.
Do you install?
No. Assembly is by the receiving team, using the sheets that travel with the order. For a large single-site fit-out we can arrange supervision through a partner, quoted separately.
What happens if something arrives damaged?
Photograph the carton before opening and the contents after. Replacements are produced in the next available slot, and the packing photographs from loading are what make that a two-day conversation rather than a two-month one.
Next step

Tell us the opening date

The date the room has to be finished decides the schedule, not the other way round. Send it with the room dimensions and we will tell you the last confirmation date that still works.